Migration Venture Africa

4.8/5 – 360 Reviews

$1,650 pp (USD)

2 travelers   on   Start date
Request a Quote

Your request will be sent directly to the operator

If preferred, you can contact the operator directly

Breakdown of Costs
1 Available
1 Unavailable
Start Date
Age at the end of the tour
Travelers

Arrival (See Getting There for more details)

Arrival (See Getting There for more details)

  • A transfer from the airport can be arranged for an extra cost.
  • Accommodation before the tour starts cannot be arranged by this operator.

Day 1

Nale Moru-Simba Camp

Nale Moru-Simba Camp

After breakfast at your hotel you will be collected by your head guide and driven to Kilimanjaro National Park for registration and to begin the climb. Form here you travel by vehicle onto the village of Nale Moru at around 1,950 meters. Today’s walk is around 3 to 4 hours, beginning on a small path that winds its way through fields of maize and potatoes before entering pine forest. You will gradually ascend trough attractive forest to the edge of the moorland zone. Extensive views over the Kenyan plains will be the highlight of today. Note that it can be wet in the rainforest and it is recommended to carry your waterproofs with you should you need them. Dinner and overnight at Simba campsite (2,650m).
Walking distance: 6.5 km/4 miles Walking time: 3-4 hours Altitude gain: 700 m/2300 ft.

Main Destination:
Rongai Gate (Mt Kilimanjaro)
Accommodation:
Budget camping
  • Near Mt Kilimanjaro
Meals & Drinks:
  • Lunch & dinner (Breakfast not included)
  • Drinking water (Other drinks not included)

Day 2

Simba Camp -Kikelelwa Cave

Simba Camp -Kikelelwa Cave

After breakfast at camp you set off to the Kikelelwa Caves. On this day you will walk around 5-6 hours from the campsite, with a steady ascent up to Second Cave at 3,450 meters. Here you are rewarded (weather permitting) with superb views of Kibo (the summit) and the Eastern ice fields on the crater rim. Tonight we have dinner and camp overnight near Kikelelwa caves at 3,800m.
Walking distance: 9 km/5.6 miles Walking time: 6-7 hours Altitude gain: 950 m/3110 ft.

Main Destination:
Mount Kilimanjaro
Accommodation:
Budget camping
  • On Mt Kilimanjaro
Meals & Drinks:
  • All meals included
  • Drinking water (Other drinks not included)

Day 3

Kikulelwa- Mawenzi Tarn Hut

Kikulelwa- Mawenzi Tarn Hut

Today’s trek is shorter, being around 3- 4 hours but involves some steeper sections. Leaving camp at a short but steep climb up grassy slopes is rewarded by a real sense of wilderness and stunning all round views. The vegetation zone is left behind. Dinner and overnight at Mawenzi Tarn Hut (4,330m).
Walking distance: 6 km/3.7 miles Walking time: 3-4 hours Altitude gain: 730 m/2400 ft Afternoon acclimatization walk to about 4500 m/14760 ft.

Main Destination:
Mount Kilimanjaro
Accommodation:
Budget camping
  • On Mt Kilimanjaro
Meals & Drinks:
  • All meals included
  • Drinking water (Other drinks not included)

Day 4

Mawenzi Tarn Hut -Kibo Hut

Mawenzi Tarn Hut -Kibo Hut

On this day you will walk for 4 to 5 hours as we cross the lunar desert of the saddle between Mawenzi and Kibo (Kilimanjaro’s two highest peaks). Early dinner and overnight at Kibo Hut (4,700M)
Walking distance: 9 km/5.6 miles Walking time: 4-5 hours Altitude gain: 370 m/1215 ft.

Main Destination:
Mount Kilimanjaro
Accommodation:
Kibo Hut
  • Budget mountain hut located on Mt Kilimanjaro
Meals & Drinks:
  • All meals included
  • Drinking water (Other drinks not included)

Day 5

Uhuru Peak -Horombo Hut

Uhuru Peak -Horombo Hut

You will be woken early (around 1am) for a hot drink and snack before beginning the summit attempt. We will trek very slowly by torchlight to reach the crater rim at Gilman’s point at 5,685 meters. We will rest there for a short time to enjoy the spectacular sunrise over Mawenzi peak. We then continue on to Uhuru (freedom) peak at 5,895 meters, the roof of Africa! We descend to Kibo hut, at 4700m to rest and have brunch before we continue down to camp at Horombo hut (3,720m).

Main Destination:
Uhuru Peak (Mt Kilimanjaro)
Accommodation:
Horombo Hut
  • Budget mountain hut located on Mt Kilimanjaro
Meals & Drinks:
  • All meals included
  • Drinking water (Other drinks not included)

Day 6

Horombo -Marangu Gate

Horombo -Marangu Gate

The final day is a descent of around 5 -7 hours to Marangu Park gate (1,700m) where you will sign out of the mountain. The walk is through lush forest on good paths. You will be met by a driver and transferred to your hotel in Moshi or Arusha.
Walking distance: 20 km/12.5 miles Walking time: 5 hours Descent: 1840 m/6040 ft.

Main Destination:
Marangu Gate (Mt Kilimanjaro)
Accommodation:
No accommodation (End of tour)
Meals & Drinks:
  • Breakfast & lunch (Dinner not included)
  • Drinking water (Other drinks not included)

End of tour (See Getting There for more details)

End of tour (See Getting There for more details)

  • Additional accommodation cannot be arranged by this operator.
  • A transfer back to the airport can be arranged for an extra cost.

Interested in This Tour?

Request a Quote

  • We advise requesting quotes from 3 operators (Learn why)
  • Requests are sent directly to the tour operator
  • If preferred, you can contact the tour operator directly
Next: Overview Next: Day by Day Next: Rates Next: Inclusions Next: Getting There Next: Offered By

Best price guarantee

Your request will be sent directly to the operator

If preferred, you can contact the operator directly

Next: Request a Quote

Disclaimer

  • This tour is offered by Migration Venture Africa, not SafariBookings.
  • This operator reserves the right to change rates advertised on SafariBookings.
  • If you request changes to this tour, the advertised rates will likely change.
  • The exact order, contents and rates of this tour are subject to availability.
  • If an accommodation is fully booked, the operator will suggest a comparable alternative.
  • This tour is subject to the terms & conditions of Migration Venture Africa.