
$1,880 pp (USD)
2 travelers on Start dateArrival
Arrival

Day 1
Arrive at Kilimanjaro Airport
Arrive at Kilimanjaro Airport
You will be picked up at the Kilimanjaro International Airport and transferred to your hotel in Moshi town, you will meet our guide who will brief you on your upcoming trek and do an equipment check to make sure you have all the necessary mountain gear. Gear which is missing can be rented on this day.
-Accommodation: Hotel in Moshi Town.
- Main Destination:
- Moshi (Town)
- Accommodation:
- Panama Garden Resort
- Meals & Drinks:

Day 2
Nalemuru Gate (1990m) to Simba Camp (2625m)
Nalemuru Gate (1990m) to Simba Camp (2625m)
After breakfast, you will be picked up at the hotel around 8:00 am and driven to the village of Nale Moru for the starting point of the Rongai route. The first stage of the trek is through farmland and pine forests. You may have a chance to see the beautiful Colobus monkeys or if you’re lucky enough, elephants or buffalos. Our first camp will be the Simba Camp located at the edge of the moorland zone at 2625m.
• Distance covered: 8km / 5mi
•Approx. time taken: 4 – 5 hours
•Meals: Breakfast, Lunch & Dinner Included.
- Main Destination:
- Mount Kilimanjaro
- Accommodation:
- Budget camping
- Meals & Drinks:

Day 3
Simba Camp (2625) to Second Cave (3480m)
Simba Camp (2625) to Second Cave (3480m)
The morning hike is a steady ascent up to the Second Cave Camp located in the moorland zone providing superb views of Kibo and the Eastern ice fields on the crater rim.
•Distance covered: 5km / 3.1mi
•Approx. time taken: 3 – 4 hours
•Meals: Breakfast, Lunch & Dinner Include.
- Main Destination:
- Mount Kilimanjaro
- Accommodation:
- Budget camping
- Meals & Drinks:

Day 4
Second Cave (3480m) to Kikelelwa Camp (3630m)
Second Cave (3480m) to Kikelelwa Camp (3630m)
Leaving the pine forest behind us, we carry on with a steady ascent walking through the moorland. There are superb views of the Eastern ice fields on the crater rim of Kibo, the highest of the three volcanoes that form the mountain range. We will leave the main trail and strike out across moorland on a smaller path towards the jagged peaks of Mawenzi, the second of Kilimanjaro’s volcanoes. We will set up camp today in the sheltered valley near Kikelewa caves at 3630m
• Distance covered: 5km / 3.1mi
• Approx. time taken: 3 – 4 hrs
• Meals: Breakfast, Lunch & Dinner Included.
- Main Destination:
- Mount Kilimanjaro
- Accommodation:
- Budget camping
- Meals & Drinks:

Day 5
Kikelelwa Camp (3630m) to Mawenzi Tarn Hut (4310m)
Kikelelwa Camp (3630m) to Mawenzi Tarn Hut (4310m)
This morning we have a short but steep ascent up grassy slopes which is rewarded by a superb view of the Kenyan plains to the north. Shortly after we leave vegetation behind reaching our next camp at Mawenzi Tarn Hut, which sits directly below the towering cliffs of Mawenzi. This afternoon you have a chance to rest or explore the surrounding area to aid acclimatization.
• Distance covered: 8km / 5mi
• Approx. time taken: 4 – 5 hours
• Meals: Breakfast, Lunch & Dinner Included.

Day 6
Mawenzi Tarn Hut (4310m) to Kibo Hut (4700m)
Mawenzi Tarn Hut (4310m) to Kibo Hut (4700m)
We leave our campsite and cross the lunar desert of the ‘saddle’ between Mawenzi and Kibo. With the summit of Kilimanjaro in the background and our trail to the high camp stretched out before our eyes we truly get to realize how spectacular this place is. Upon reaching our camp the remainder of the day will be spent resting in preparation of the final ascent after a very early night!
• Distance covered: 8km / 5mi
• Approx. time taken: 5 – 6 hours
• Meals: Breakfast, Lunch & Dinner Included.
- Main Destination:
- Mount Kilimanjaro
- Accommodation:
- Kibo Hut
- Meals & Drinks:

Day 7
Kibo Hut (4700m) to Uhuru Peak (5895m) then, down to Horombo Hut (3700m)
Kibo Hut (4700m) to Uhuru Peak (5895m) then, down to Horombo Hut (3700m)
Today is “The Big Day” – the summit stage. You will begin your final ascent around midnight which will be long and strenuous. Passing the Hans Meyer Cave at 5220m, the climb slowly but surely goes upwards. At sunrise, you will reach Gillman’s Point (5681m) – the crater rim of Kilimanjaro – where the sun will slowly start to warm up the land. You will have soon forgotten the cold of the night and after a further hike of 1 – 2 hours, you will reach Uhuru Peak at 5895m. On your return to Kibo Hut, a warm meal awaits you followed by a 1 – 2 hour break before proceeding back down to Horombo Hut.
• Distance covered: 22km / 13.7mi
• Approx. time taken: 12 – 15 hours
• Meals: Breakfast, Lunch & Dinner Included.

Day 8
Horombo Hut (3700) to Marangu Gate (1860m)
Horombo Hut (3700) to Marangu Gate (1860m)
The last stage passes through the heath and moor zone to the Mandara Hut (2700m) where a warm lunch is waiting for you. Continuing through the tropical rainforest and after a total time of 6 hours trekking, we will be back at the Kilimanjaro National Park Gate (1860m). After saying goodbye to your mountain guides, a private car will then take you back to your hotel where you can enjoy the warm shower you have been craving. It’s time to celebrate!
• Distance covered: 20.8km / 12.9mi
• Approx. time taken: 8 hours
• Meals: Breakfast, Lunch.
- Main Destination:
- Marangu Gate (Mt Kilimanjaro)
- Accommodation:
- Panama Garden Resort
- Meals & Drinks:

Day 9
Depart Tanzania / Airport Drop off
Depart Tanzania / Airport Drop off
The day is reserved for relaxation after your trek before your departure home. Depending on your schedule, you may choose to explore Moshi town, shop for souvenirs, or simply unwind.
Optional safari extensions and other add-ons are available if you wish to continue exploring Tanzania.
- Main Destination:
- Kilimanjaro Airport
- Accommodation:
- No accommodation (End of tour)
- Meals & Drinks: